焦化气草莓视频黄色网站电气系统调试
焦化气草莓视频黄色网站构成及发电原理在工程中各发电厂所使用的焦化气草莓视频黄色网站品牌不同,有国内设备、也有国外设备,其功率大小也不尽相同,但从整个瓦斯发电工艺流程来看是一致的,其系统都是由进气排气系统、点火系统、润滑系统、冷却系统、综合控制等系统构成。瓦斯电站布局示意图煤层气发电工程中都建有储气柜,保证燃机用气的稳定。
The composition and power generation principle of coking gas generator units vary among different brands of coking gas generator units used in various power plants in the project, including domestic and foreign equipment, and their power levels are also different. However, from the perspective of the entire gas power generation process, they are consistent, and their systems are composed of intake and exhaust systems, ignition systems, lubrication systems, cooling systems, comprehensive control systems, etc. Gas power station layout diagram: Gas storage tanks are built in coalbed methane power generation projects to ensure the stability of gas supply for gas turbines.
储气柜中的瓦斯气体经过瓦斯气预处理系统后,到达燃气机组进入燃机混合器中,同时空气经过空气滤芯后同时进入混合器。在燃机混合器内,燃机对空气和瓦斯气进行自动配比后形成混合气体,混合气体经过涡轮增压器后,再经过冷却器进行两级冷却,使气体温度稳定在一定范围内,通过不断调整节气阀,从而调整进气量,最后进入气缸内进行压缩、做功,从而使发动机驱动发电机进行发电。焦化气草莓视频黄色网站经做功排出的废气一般供给余热锅炉及其他换热设备或直接排入大气中。
The gas in the gas storage tank passes through the gas pre-treatment system and enters the gas turbine mixer. At the same time, the air passes through the air filter and enters the mixer. In the gas turbine mixer, the gas turbine automatically proportions air and gas to form a mixed gas. After passing through the turbocharger, the mixed gas is cooled in two stages by the cooler to stabilize the gas temperature within a certain range. By continuously adjusting the throttle valve, the intake air volume is adjusted, and finally it enters the cylinder for compression and work, so that the engine drives the generator to generate electricity. The exhaust gas discharged from the coking gas generator unit through work is generally supplied to waste heat boilers and other heat exchange equipment or directly discharged into the atmosphere.
焦化气草莓视频黄色网站电气系统调试
Electrical system commissioning of coking gas generator set
焦化气草莓视频黄色网站中机务、热工、电气等系统试运行前必须经过调试才可以投运,这是机组安全投运的重要保证,其中电气系统调试主要流程见图1。 电气系统调试流程
Before the trial operation of the mechanical, thermal, electrical and other systems in the coking gas generator unit, they must be debugged, which is an important guarantee for the safe operation of the unit. The main process of electrical system debugging is shown in Figure 1. Electrical system debugging process
1.调试准备焦化气草莓视频黄色网站本体设备安装、内部与外部系统一次电缆、二次电缆接线完毕,具备合格的交直流电源并具备送电条件,现场调试照明设施及消防安全设施齐备。焦化气草莓视频黄色网站的图纸及技术资料齐全,草莓视频黄色网站保护及自动控制装置的整定值计算及相关参数设定值已经计算、汇总完成。调试用微机保护校验仪、数字式绝缘电阻测试仪、高压核相器、相序表、数字相位表、互感器特性测试仪、机组启动测控仪、高压耐压试验仪等调试设备齐全,设备性能符合现场调试要求、安全可靠且在鉴定有效期内。
1. Preparation for commissioning: The installation of the main equipment of the coking gas generator unit, the wiring of the primary and secondary cables of the internal and external systems, and the qualified AC/DC power supply and power transmission conditions have been completed. The on-site commissioning lighting facilities and fire safety facilities are complete. The drawings and technical data of the coking gas generator unit are complete, and the setting values and related parameter settings of the generator unit protection and automatic control devices have been calculated and summarized. The debugging equipment includes microcomputer protection calibrator, digital insulation resistance tester, high-voltage core phase transformer, phase sequence meter, digital phase meter, transformer characteristic tester, unit start-up measurement and control instrument, high-voltage withstand voltage tester, etc. The equipment performance meets the requirements of on-site debugging, is safe and reliable, and is within the validity period of identification.
2.控制系统带电及辅助设备试运
2. Control system live and auxiliary equipment trial operation
依据设备厂家提供的控制柜接线图检查内部接线回路、各回路元器件及插件安装情况。确认没有卡件松动、导线虚接等情况。然后使系统控制柜内所有电源开关处于断开位置,用500V绝缘电阻测试仪测量线路对外壳绝缘电阻,应无短路、接地现象。对地绝缘电阻值应满足设计及相关技术规范要求。检查外部电源情况正常后。按技术说明书依次投入各路控制电源。使机组本体综合电子管理系统、辅助设备控制系统带电。送电后观察控制柜中装置面板的指示灯是否点亮、显示是否正常。修改电子管理系统时钟及各系统参数,断、合直流电源后,各参数应保证不变。有双路电源供电的应进行冗余电源切换试验。在机组机务、热工等调试人员配合下,检查燃机系统中变频装置、冷却风机、润滑油泵、电动门、电磁阀等燃机辅助设备是否具备送电条件,确认无误后对附属设备进行送电及试运行,试验合格标准参照各专业标准执行。
Check the internal wiring circuit, components and plug-in installation of each circuit according to the control cabinet wiring diagram provided by the equipment manufacturer. Confirm that there are no loose card components or loose wire connections. Then make all power switches in the system control cabinet in the disconnected position, and use a 500V insulation resistance tester to measure the insulation resistance of the circuit to the shell. There should be no short circuit or grounding phenomenon. The ground insulation resistance value should meet the requirements of the design and relevant technical specifications. After checking that the external power supply is functioning properly. Input each control power supply in sequence according to the technical manual. Make the integrated electronic management system and auxiliary equipment control system of the unit live. After power transmission, observe whether the indicator lights on the device panel in the control cabinet are lit and whether the display is normal. Modify the clock and various system parameters of the electronic management system, and ensure that all parameters remain unchanged after disconnecting and connecting the DC power supply. Redundant power switching test should be conducted for those with dual power supply. With the cooperation of the unit maintenance and thermal commissioning personnel, check whether the auxiliary equipment of the gas turbine system, such as the frequency converter, cooling fan, lubricating oil pump, electric door, solenoid valve, etc., have the power transmission conditions. After confirming that there are no errors, power transmission and trial operation of the auxiliary equipment are carried out. The qualified test standards shall be implemented in accordance with the standards of each profession.
3.机组发电机转子、定子及互感器试验
3. Test of rotor, stator and transformer of the generator unit
焦化气草莓视频黄色网站中一次设备除发电机定子、转子外,一般还带有电流及电压互感器。对于封装在机组内部的互感器可以不进行试验,重点检查出厂试验报告相关数据是否满足标准要求,具备试验条件的按交接试验标准进行。试验项目及合格标准参照电气装置安装工程电气设备交接试验相关要求执行,主要试验项目有转子定子绝缘电阻、绕组直流电阻、互感器变比、接线组别及极性、励磁特性曲线、交流耐压等试验,试验测量结果应满足规范和制造厂设计文件要求。所有试验项目严格按规范标准及电气设备调试作业指导书的要求进行。保证测量结果真实、准确。试验过程中对安装完的设备及接线拆动的,试验完成后必须按安装的设计要求恢复。同时为了防止设备污染或损坏,调试完成后必须恢复设备原有的防护罩及相关保护设施。部分设备需要厂家指导及协助进行的调试项目,调试前需要及时联系厂家到达现场,并积极配合现场技术人员,落实好安全技术措施。调试中如果遇到问题。必须及时解决并报告主管负责人。
In addition to the stator and rotor of the generator, the primary equipment in coking gas generator sets generally also includes current and voltage transformers. For transformers packaged inside the unit, testing is not required. The focus is on checking whether the relevant data in the factory test report meets the standard requirements. If the testing conditions are met, the handover test standards shall be followed. The test items and qualification standards shall be carried out in accordance with the relevant requirements of the electrical equipment handover test for electrical installation engineering. The main test items include rotor stator insulation resistance, winding DC resistance, transformer ratio, wiring group and polarity, excitation characteristic curve, AC withstand voltage and other tests. The test measurement results shall meet the requirements of the specifications and manufacturer's design documents. All experimental projects shall be strictly carried out in accordance with the requirements of the specifications, standards, and electrical equipment commissioning operation manual. Ensure that the measurement results are true and accurate. During the experiment, if the installed equipment and wiring are disassembled, they must be restored according to the installation design requirements after the experiment is completed. At the same time, in order to prevent equipment contamination or damage, the original protective cover and related protective facilities of the equipment must be restored after debugging is completed. Some equipment requires guidance and assistance from the manufacturer for debugging projects. Before debugging, it is necessary to promptly contact the manufacturer to arrive at the site and actively cooperate with on-site technical personnel to implement safety technical measures. If encountering problems during debugging. It must be resolved promptly and reported to the supervisor in charge.
4.机组电气保护整定及传动试验
4. Electrical protection setting and transmission test of the unit
焦化气草莓视频黄色网站的电气保护一般设置有过载、高频低频、差动、接地、励磁故障等,不同的厂家保护配置有所不同。试验时参照燃机电气保护装置技术文件,对定值单的内容逐项进行核对,设置保护模块中机组发电机各侧的CT变比、PT变比、电流电压值及各种保护参数。调试时用继电保护测试仪对保护模块进行相应的模拟故障试验,使保护可靠动作,检查各插件面板指示灯动作及出口继电器输出情况,用万用表在端子排查该保护的所有跳闸出口接点动作是否正确,外部有连锁的接点检查连锁动作情况。一般应重点检查发电机保护动作后连锁跳闸出口高压开关、瓦斯气预处理系统输入及排空阀、厂区锅炉系统等连锁动作情况。验证各系统逻辑动作的准确性及可靠性。试验过程中需要注意跳闸出口继电器输出接点极性应与外回路直流电源极性配合。
The electrical protection of coking gas generator units generally includes overload, high frequency and low frequency, differential, grounding, excitation faults, etc., and the protection configuration varies among different manufacturers. During the experiment, refer to the technical documents of the gas turbine electrical protection device, check the contents of the fixed value sheet item by item, and set the CT ratio, PT ratio, current and voltage values, and various protection parameters on each side of the generator in the protection module. During debugging, use a relay protection tester to conduct corresponding simulated fault tests on the protection module to ensure reliable operation of the protection. Check the operation of the indicator lights on each plugin panel and the output of the outlet relay. Use a multimeter to check whether all the tripping outlet contacts of the protection are operating correctly at the terminals. Check the interlocking operation of external contacts with interlocking connections. Generally, it is important to focus on checking the interlocking actions of the high-voltage switch at the outlet of the generator after the protection action, the input and exhaust valves of the gas pre-treatment system, and the boiler system in the factory area. Verify the accuracy and reliability of the logical actions of each system. During the experiment, it is important to note that the polarity of the output contact of the trip outlet relay should be coordinated with the polarity of the external DC power supply.
5.机组启动及并网
5. Unit start-up and grid connection
按焦化气草莓视频黄色网站操作规程及相关技术文件要求,现场试验阶段的启动由设备厂家负责起动。现场检测起动过程中各参数是否在正常运行范围内,瓦斯机组整体严密性是否合格,没有出现漏油、漏水、漏气等情况。同时熟悉机组在手动、自动控制状态下的操作控制,查看各动态参数是否正常。在焦化气草莓视频黄色网站额定转速下,完成机组启动相关试验。电气相关试验主要有空载试验和短路试验,通过试验检查机组电压电流回路准确性、保护动作情况,录制发电机空载特性曲线及短路特性曲线。瓦斯燃气机组各运行参数检查及机组本体各专业试验完成后,核对燃机发电侧电压及系统侧电压是否满足同期并网条件。应保证机组发电机输出电压、频率、相位与系统电网数相近,经过出口高压开关两侧核相、假同期试验、手动或自动准确,才能同期实现焦化气草莓视频黄色网站并网。
According to the operating procedures and relevant technical documents for coking gas generator units, the equipment manufacturer is responsible for starting the on-site testing phase. On site inspection was conducted to ensure that all parameters during the start-up process were within the normal operating range, and that the overall tightness of the gas unit was qualified without any oil, water, or gas leaks. At the same time, familiarize oneself with the operation and control of the unit in manual and automatic control states, and check whether various dynamic parameters are normal. Complete the relevant tests for unit start-up at the rated speed of the coking gas generator set. Electrical related tests mainly include no-load tests and short-circuit tests. Through the tests, the accuracy of the voltage and current circuits of the unit, the protection action, and the recording of the generator's no-load characteristic curve and short-circuit characteristic curve are checked. After checking the operating parameters of the gas turbine unit and conducting various professional tests on the unit itself, verify whether the voltage on the generator side and the system side of the gas turbine meet the conditions for synchronous grid connection. It should be ensured that the output voltage, frequency, and phase of the unit generator are similar to the number of power grids in the system. Only after undergoing phase verification and false synchronization tests on both sides of the outlet high-voltage switch, manual or automatic accuracy, can the coking gas generator unit be connected to the grid synchronously.
6.试验记录整理
6. Experimental record organization
焦化气草莓视频黄色网站试验及试运行记录按事先准备好的记录表格填写,必须准确和详细,做到每项记录都有可追溯性。
The test and trial operation records of coking gas generator units must be filled out in accordance with the pre prepared record form, which must be accurate and detailed, ensuring traceability for each record.
调试过程注意事项
Notes on Debugging Process
调试过程注意事项:1.试验过程中送电、送气及其他工作事宜均由调试总负责人负责,做到各系统有序协调,专业调试人员应参加调试各阶段工作的检查、交接验收等工作。2.焦化气草莓视频黄色网站在试验过程时一旦发生瓦斯泄漏,严禁在运行状态下用铁质工具对泄漏点进行修理紧固,应停机后将设备或管道内瓦斯排尽后再做处理,同时在发电厂区域内严禁吸烟,严禁采用非防爆设备作业,严禁动火动焊作业。3.电气试验中对回路进行绝缘测试时,应将弱电部件断开或短接,避免损坏弱设备。严禁带电拔、插插件,试验结束后严禁对相关保护及参数进行更改操作,若有更改,应及时通知调试专业人员。4.调试过程中,可能出现瓦斯压力过大,瓦斯泄漏、电气故障跳闸等异常情况,应制定相应的安全保护措施及应急预案。
Precautions for debugging process: 1. During the testing process, the overall person in charge of debugging is responsible for power and air supply, as well as other work matters, to ensure orderly coordination among various systems. Professional debugging personnel should participate in the inspection, handover and acceptance of each stage of debugging work. 2. In case of gas leakage during the testing process of the coking gas generator unit, it is strictly prohibited to use iron tools to repair and tighten the leakage point while in operation. The equipment or pipeline should be drained of gas before treatment after shutdown. Smoking is strictly prohibited in the power plant area, non explosion proof equipment operation is strictly prohibited, and hot work welding operation is strictly prohibited. When conducting insulation tests on circuits in electrical tests, weak electrical components should be disconnected or short circuited to avoid damaging weak equipment. It is strictly prohibited to unplug or plug in with electricity. After the test is completed, it is strictly prohibited to change the relevant protection and parameters. If there are any changes, the debugging professionals should be notified in a timely manner. During the debugging process, there may be abnormal situations such as excessive gas pressure, gas leakage, electrical failure tripping, etc. Corresponding safety protection measures and emergency plans should be formulated.
结束语
Conclusion
焦化气草莓视频黄色网站从安装到并网发电,涉及到电气、热工、机务等各专业调试,需要各个专业相互配合才能实现机组并网发电。其中电气系统调试贯穿干焦化气草莓视频黄色网站调试整个阶段。本文也仅仅就电气专业调试程序进行了介绍与总结,许多调试及维护工作还需要设备厂家专业技术人员指导才能完成。工程实践中还会接触到更多不同类型的焦化气草莓视频黄色网站。每位调试技术人员只有不断学习、不断积累经验,才能更好地认识、掌握燃气机组的调试。
The installation and grid connected power generation of coking gas generator units involve various professional debugging such as electrical, thermal, and mechanical engineering, which require mutual cooperation among various professions to achieve grid connected power generation. The electrical system debugging runs through the entire stage of the commissioning of the dry coking gas generator unit. This article only introduces and summarizes the electrical professional debugging program. Many debugging and maintenance tasks still require guidance from professional technical personnel from equipment manufacturers to complete. In engineering practice, we will also come into contact with more different types of coking gas generator units. Only by continuously learning and accumulating experience can each debugging technician better understand and master the debugging of gas turbines.
本文由 焦化气草莓视频黄色网站 友情奉献.更多有关的知识请点击 http://www.mcdcar.com/ 真诚的态度.为您提供为全面的服务.更多有关的知识草莓影院在线观看将会陆续向大家奉献.敬请期待.
This article is a friendly contribution from a coking gas generator set For more related knowledge, please click http://www.mcdcar.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.